FastCo Head Office and warehouse, Vaudreuil

A new 4,000m² building and a 3,500m² second phase extension. The first phase houses common areas including offices, a showroom, a kitchen, changing rooms, a design centre, a graphics department, a small parts storage area,  as well as two vehicle servicing and testing areas. The second phase consists of workshops, tire and spare part storage, which are attached to 12 loading docks. Structural components have been specifically designed to allow the free circulation of people and equipment throughout the building. The building was designed to adapt easily to possible future expansions. Sustainable design features include: maximum use of natural lighting, low emissivity tinted windows filled with argon gas, fluorescent lighting with low energy consumption, individually controlled mechanical systems, workstation and equipment reuse and low VOCs emitting materials.

 

Projets Similaires
Curtiss Dining Hall, Borden

Curtiss Dining Hall, Borden

This new one and half storey building, totalling 5 483 m², houses a kitchen and a dining room for the National Defense at the Canadian Forces Base Borden in Ontario. Designed for 750 people, the kitchen serves 1500 meals (2 services) an hour. The building provides...

Vickers Kitchen and Dining Hall, Borden

Vickers Kitchen and Dining Hall, Borden

This new 5 023 m² building houses a kitchen and a dining hall for the National Defense at the Canadian Forces Base Borden in Ontario. Designed to accommodate 750 diners, the building provides user friendly circulation to and from all serving areas and dining zones....

BÂTIMENT POLYVALENT, VALCARTIER

BÂTIMENT POLYVALENT, VALCARTIER

Le programme consistait en la construction d’un nouvel espace de plus de 30 000 m2 sur 2 étages, la rénovation de deux abris temporaires existants et l’aménagement du site et des aires de stationnement pour véhicules civils et militaires. La conception se devait...